Description & Experiences

Description

Supported by experienced and certified experts and also by capable supporting resources, KWARSA HEXAGON has proved it self to be able to manage excellently a variety of environmental studies in a various strategic projects from the Government, National and International Private Companies which are located almost in all over of Indonesia, among others :

tes

  • Environmental Impact Analysis (EIA) Study for Highway and Provincial/ District Roads.
  • Environmental Impact Analisys (EIA) Study for Gas and Steam Power Plant, Gas Power Plant, Coal-fired Power Plant, Water Power Plant.
  • Environmental Impact Analisys (EIA) Study for Extra High Voltage Transmission Line 500 kV.
  • Environmental Impact Analisys (EIA) Study for Underground Cable 500 kV.
  • Environmental Impact Analisys (EIA) Study for DAM and Water Reservoir.
  • Environmental Impact Analisys (EIA) Study for Industrial Sector and Building Construction.
  • Environmental Management Effort and Environmental Monitoring Effort Study for High Voltage Transmission Line 150 kV.
  • Environmental Management Effort and Environmental Monitoring Effort Study for Fly Over, on Ramp–of Ramp, Highway Rest Area.
  • Environmental Monitoring for Gas and Steam Power Plant , Gas Power Plant, Coal-fired Power Plant, Water Power Plant.
  • Building Revitalization Environmental Study and other Environmental Study.Conversion Kerosene to LPG
ProjectClientYearsDetail
Studi AMDAL T/L 150 KV Gitet Medan Barat - Pangkalan Susu dan GI TerkaitPT PLN (Persero) UIP SUMBAGUT-Detail
Jasa Konsultan Desain Pengolahan FABA, Izin Limbah dan UKL UPL PT. Indo Pusaka Berau-Detail
PENYUSUNAN DOKUMEN UKL-UPL SUTT 150 KV KARIANGAU-GI.SEPAKU DAN GI.SEPAKUPT PLN (Persero) UIP KALBAGTIM-Detail
PENYUSUNAN DOKUMEN UKL-UPL GARDU INDUK 150 KV SEKATAKPT PLN (Persero) UIP KALBAGTIM-Detail
PENYUSUNAN REVISI DOKUMEN UKL-UPL PLTMG NUNUKAN -2 (10 MW)PT PLN (Persero) UIP KALBAGTIM-
  • KESEPAKATAN HARGA SATUAN PELAKSANAAN KEGIATAN PEMANTAUAN DAN PENGELOLAAN LINGKUNGAN HIDUP KALTIMPT PLN (Persero) UIP KALBAGTIM-Detail
    Pengadaan Studi AMDAL SUTET 500 kV Ungaran - Pedan Sirkit 2, GITET 500 kV Ampel Incomer, GI 150 kV Ampel New dan IncomerPT PLN (Persero) UIP JBT II2019Detail
    Jasa Konsultansi Verifikasi Legalitas Lahan Untuk Proyek Pembangkit Listrik di Sumatera UtaraPT Pembangkitan Jawa Bali2019Detail
    Jasa Konsultansi Penyusunan Dokumen AMDAL Pembangunan SUTT 150 KV dan Gardu Induk Pada Jalur PLTMG Kupang (Peaker) - GI NaibonatPT PLN (Persero) UIP NUSRA2018
  • JASA PENYUSUNAN DOKUMEN UKL-UPL SUTT 150 KV GI PANGKALAN BANTENG � INCOMER DAN GI 150 KV PANGKALAN BANTENGPT PLN (Persero) UIP KALBAGTENG2018Detail
    Pengadaan Pembuatan Dokumen Lingkungan Hidup DISJAYAPT. PLN (Persero) Distribusi Jakarta Raya2018Detail
    Jasa Konsultansi Penyusunan Dokumen Kajian Izin Pembuangan Limbah Cair (IPLC) PLTMG MPP KALTIM 30 MWPT PLN (Persero) UIP KALBAGTIM2018Detail
    LAND ACQUISITION AND RESETTLEMENT ACTION PLAN (LARAP) RENCANA SPAM REGIONAL METROPOLITAN CIREBON RAYAPT. Tirta Gemah Ripah2018Detail
    Pengadaan Studi UKL UPL GI 150 kV Rengasdengklok II/Cilamaya dan SUTT 150 kV Rengasdengklok II/Cilamaya - SukamandiPT PLN (Persero) UIP JBT II2018Detail
    Pengadaan Studi UKL UPL SUTT 150 kV Tanggeung (Cianjur Selatan) - Jampang Kulon (Pelabuhanratu Baru)PT PLN (Persero) UIP JBT II2018
  • UKL UPL SUTT 150 KV Kiaracondong II Incomer dan GIS 150 KV Kiaracondong IIPT PLN (Persero) UIP JBT II2017Detail
    Penyusunan Dokumen UKL-UPL Gardu Induk 150 KV Long IkisPT PLN (Persero) UIP KALBAGTIM2017Detail
    Studi UKL-UPL GI 150 kV Babakan Baru dan SUTT 150 kV Babakan Baru IncomerPT PLN (Persero) UIP JBT II2017Detail
    Penyusunan Dokumen UKL UPL SUTT 150 kV GI Paringin-Incomer & GI 150 kV ParinginPT PLN (Persero) UIP KALBAGTENG2017Detail
    Penyusunan Dokumen Lingkungan PPN KejawananPelabuhan Perikanan Nusantara Kejawanan2017Detail
    Pengadaan Studi Addendum AMDAL SUTET 500 kV Bandung Selatan IncomerPT PLN (Persero) UIP JBT II2017Detail
    Penyusunan Dokumen UKL-UPL SUTT 150 KV Muara Wahau-Tanjung Redep Dan GI Muara WahauPT PLN (Persero) UIP KALBAGTIM2017Detail
    Jasa Konsultansi Penyusunan Dokumen Amdal SUTT 150 KV & GI Pada Jalur PLTMG Maumere - GI LarantukaPT PLN (Persero) UIP NUSRA2017Detail
    Pengadaan Jasa Monitoring RKL/RPL 2015PT.PJB UBJ O&M PLTU Tanjung Awar Awar2016Detail
    Penyusunan Dokumen UKL-UPL Gardu Induk 150 KV New PalangkarayaPT. PLN (Persero) UIP X2016Detail
    JASA KONSULTANSI DOKUMEN PEMANTAUAN dan PENGELOLAAN LINGKUNGAN HIDUP BIJB KERTAJATIDishub Provinsi Jawa Barat2016Detail
    Jasa Monitoring RKL RPL/UKL UPL Transmisi & Jaringan di Area JJBT 2 Semester 1 Tahun 2016PT. PLN (Persero) UIP JBT II2016Detail
    Jasa Monitoring RKL RPL/UKL UPL Transmisi & Jaringan di Area JJBT 3 Semester 1 Tahun 2016PT. PLN (Persero) UIP JBT II2016Detail
    Jasa Monitoring RKL RPL/UKL UPL Transmisi & Jaringan di Area JJBT 3 Semester 2 Tahun 2016PT. PLN (Persero) UIP JBT II2016Detail
    Jasa Monitoring RKL RPL/UKL UPL Transmisi & Jaringan di Area JJBT 2 Semester 2 Tahun 2016PT. PLN (Persero) UIP JBT II2016Detail
    UKL-UPL Uprating SUTT 150 KV GIS 150 KV Gandaria - GI 150 KV CibinongPT PLN (Persero) UIP V2016Detail
    Monitoring RKL/RPL 2014PT. Pembangkitan Jawa Bali, Unit Bisnis Jasa O & M Indramayu2015Detail
    Jasa Konsultansi Kegiatan Social Mapping Untuk Mendukung Kegiatan Proper di Lingkungan PLN UPJBPT. PLN (Persero) Unit Pembangkitan Jawa Bali2015Detail
    Pengadaan Jasa Penyusunan Studi AMDAL, ANDAL LALIN dan Peta Lokasi PLTGU Jawa 2 Kapasitas 800 (MW) Lokasi Tanjung Priok, Jakarta Utara, DKI JakartaPT. PLN (Persero) Unit Induk Pembangunan VIII2015Detail
    PAKET PENYUSUNAN DOKUMEN LINGKUNGAN HIDUP PROV. SULTRAPERENCANAAN DAN PENGAWASAN JALAN NASIONAL PROV. SULTRA2015Detail
    Jasa Monitoring RKL/RPL PT. PLN (Persero) Unit Pembangkitan Jawa Bali Sektor Pengendalian Pembangkitan Indramayu, Desa Sumuradem Kecamatan Sukra, Kabupaten Indramayu - Jawa Barat tahun 2013PT. PLN (Persero) Unit Pembangkitan Jawa Bali sektor Pengendalian Pembangkitan Indramayu2014Detail
    Studi UKL - UPL PLTA Rajamandala 47 MW dan Transmisi 150 kV.PT. Indonesia Power (Persero)2011Detail
    Study UKL/UPL SUTT 150 kV Braga - Cigereleng dan Study UKL/UPL SUTT 150 kV Ujung Berung - New Ranca Kasumba.Proyek Induk Pembangkit dan Jaringan Jawa Bali dan Nusa Tenggara2009Detail
    Pembuatan Study AMDAL Jalan TOL Kertosono - Mojokerto.PT. Marga Hanurata Intrisnic2007Detail
    Penyusunan AMDAL Pembangunan Jalan TOL Paket 7 Ruas : Probolinggo - Banyuwangi, Simpang Susun Waru - Tanjung Perak II.Satuan Kerja Badan Pengatur Jalan TOL Departemen Pekerjaan Umum2006Detail