Description & Experiences

KWARSA HEXAGON in cooperation with national and international stake holders has identified many strategic business challenges and opportunities and has been developed effective and practice solutions for energy and power plant development purposes, such as engineering services in:

ProjectClientYearsDetail
Penyusunan Dokumen Proposal Penawaran PLTM Prafi (2 x 1.250 kW) Santong (1 x 1000 kW) Ndunga (1 x 1000 kW)PT. ENERFRA SEPTADAYA PRIMA-Detail
JASA KONSULTANSI SUPERVISI KONSTRUKSI PROYEK JARINGAN WILAYAH KERJA SULAWESI SELATAN PT PLN (PERSERO) PUSAT MANAJEMEN KONSTRUKSIPT. PLN PUSMANKON-Detail
JASA KONSULTANSI SUPERVISI KONSTRUKSI PROYEK JARINGAN SUTET 500 KV INDRAMAYU � CIBATU PT PLN (PERSERO) PUSAT MANAJEMEN KONSTRUKSIPT. PLN PUSMANKON2020Detail
Pengadaan Jasa Konsultan Manajemen Konstruksi Rehabilitasi PLTP Kamojang Unit 1PT. INDONESIA POWER2017
  • Penyusunan Detail Engineering Design PLTM CikembangPT. Tirta Gemah Ripah2017
  • Feasibility Study Of Ulumbu And Mataloko Geothermal Power Plants ProjectELC ELECTROCONSULT S.P.a2017Detail
    Engineering Services for Asahan 3 Hydroelectric Power Plant Construction Project (84 MW).PT. PLN (Persero)2016
  • Engineering Services for Java - Sumatera Interconnection Transmission Line Project.PT. PLN (Persero)2016Detail
    Pekerjaan Jasa Konsultan Engineering & Construction Services untuk Proyek Indarung VIPT. Semen Padang2016Detail
    Konsultansi Teknis dan Pengawasan EPCC Proyek - Proyek PT. PGE ( KARAHA )PT. Pertamina Geothermal Energy2016
  • Penyusunan Studi Kelayakan Pemanfaatan Waduk Sermo di Provinsi Daerah Istimewa Yogyakarta DIRJEN EBTKE2016Detail
    Penyusunan Studi Kelayakan Pemanfaatan Waduk Pondok dan Waduk Sangiran di Provinsi Jawa TimurDIRJEN EBTKE2016Detail
    Indramayu Coal Fired Power Plant Project /Proyek Pembangkit Listrik Tenaga UAP Batubara IndramayuPT.PLN ( Persero )2016
  • Pekerjaan Jasa Konsultan Sipil Paket CE-II untuk Proyek Indarung VIPT. Semen Padang2015Detail
    Jasa Konsultansi Supervisi Engineering PLTU 3 Banten -Teluk Naga (Lontar) 3 x 300 MWPT.REKADAYA ELEKTRIKA2015Detail
    Supervisi dan QA/QC Proyek PLTU Sumbar (2 x 100 MW).PT. PLN (Persero)2014Detail
    Jasa Konsultan Pengawas Kontrak Pembangunan (EPC) PLTP Patuha 1 (1 x 55 MW).PT. Geo Dipa Energi2014Detail
    Studi Kelayakan dan Penyusunan DED Pembangkit Listrik Tenaga AnginDitjen Energi Baru Terbarukan dan Konservasi Energi, Kementerian Energi dan Sumber Daya Mineral2014Detail
    Project Management Work of Combined Cycle Power Plant Project (1 x 120 MW) Cilegon - Indonesia.BLV2013Detail
    Project Management Consultant Services PLTG Senipah (2 x 41 MW).PT. Kertanegara Energi Perkasa2013Detail
    Supervisi Konstruksi dan QA/QC PLTU Alor - NTT (2 x 3 MW).PT. PLN (Persero)2013Detail
    Jasa Kajian Penggantian Penstock PLTA Siman dan PLTA GiringanPT. Pembangkitan Jawa Bali, Unit Pembangkitan Brantas2013Detail
    Studi Kelayakan Pemanfaatan Potensi MIkro HidroDirektorat Jenderal EbTKE2013Detail
    Quality Assurance and Quality Control for Four Coal Fired Steam Power Plant Project (PLTU 1 Banten, PLTU 2 Jawa Timur, PLTU 1 Jawa Tengah & PLTU 2 Jawa Tengah - Package 1). PT. PLN (Persero) Pikitring Jawa Bali & Nusa Tenggara2012Detail
    Assignment of Inspectors for Tanjung Priok Gas Fired Power Plant Project (720 MW).Tokyo Electric Power Services CO., Ltd2012Detail
    Supervisi Konstruksi dan QA / QC PLTU Berau (2 x 7 MW) dan PLTU Tanjung Selor (2 x 7 MW) di Kalimantan Timur.PT. PLN (Persero) Proyek Induk Pembangkit dan Jaringan Kalimantan2012Detail
    Pekerjaan Studi Kelayakan PLTA Sawangan ( 2 x 8 MW) PT. PLN (Persero) Pusat Enjiniring Ketenagalistrikan.PT. PLN (Persero) Pusat Enjiniring Ketenagalistrikan2012Detail
    Studi Kelayakan, Desain Dasar dan Desain Rinci PLTM Nua, PT. PLN (Persero) Pusat Enjiniring Ketenagalistrikan.PT. PLN (Persero) Pusat Enjiniring Ketenagalistrikan2012Detail
    Studi Kelayakan PLTU Sulut - 1 (2 x 25 MW).PT. PLN (Persero) Pusat Enjiniring Ketenagalistrikan2012Detail
    Studi Kelayakan (FS) PLTG/PLTMG Sumbagut 3 & 4 (200-220 MW) Lokasi ArunPT. PLN (Persero) Pusat Enjiniring Ketenagalistrikan 2012Detail
    Assignment of Local Engineers for Tanjung Jati - B Expansion Project.FICHTNER GmbH & Co KG2011Detail
    Assignment of Inspectors for Muara Karang Gas Power Plant Project (720 MW).Tokyo Electric Power Services CO., Ltd2011Detail
    Assignment of Inspectors for Muara Tawar Gas Power Plant Extension Project (225 MW). Tokyo Electric Power Services CO., Ltd2011Detail
    Engineering Services for Tanjung Priok Gas Fired Power Plant Extension Project - Assignment of Inspector (Phase - 1 Amendement No. 5).Tokyo Electric Power Services Co., Ltd. (TEPSCO) Tanjung Priok Gas Fired Power Plant Extension Project2011Detail
    F/S dan Detail Design PLTM Terminabuan (2 x 500 kW).PT. PLN (Persero) Proyek Induk Pembangkit dan Jaringan Sulawesi, Maluku dan Papua2011Detail
    F/S dan Detail Design PLTM Nasulu 1 (2 x 2000 kW).PT. PLN (Persero) Proyek Induk Pembangkit dan Jaringan Sulawesi, Maluku dan Papua2011Detail
    Feasibility Study PLTG Sulsel Baru (Peaking) (2 x 50 MW) PT. PLN (Persero) Pusat Enjiniring Ketenagalistrikan.PT. PLN (Persero) Pusat Enjiniring Ketenagalistrikan2011Detail
    Studi Kelayakan PLTG Minahasa (Peaking) (1 x 25 MW) PT. PLN (Persero) Pusat Enjiniring Ketenagalistrikan.PT. PLN (Persero) Pusat Enjiniring Ketenagalistrikan2011Detail
    Studi Kelayakan, Basic Design, Dokumen Tender PLTA BEH - I (26 MW) Lokasi Kabupaten Sumbawa Besar, Provinsi Nusa Tenggara Barat.PT. PLN (Persero) Pusat Penelitian dan Pengembangan Ketenagalistrikan2011Detail
    Kajian Implementasi Biogas Untuk Listrik.PT. PGN (Persero) Tbk.2011Detail
    Pra - Studi Kelayakan PLTU IPP Mulut Tambang Sumatera Selatan (2 x 600 MW).PT. PLN (Persero) Pusat Penelitian dan Pengembangan Ketenagalistrikan2011Detail
    Survey Potensi Energi Perdesaan di wilayah Sumatera.Direktorat Jenderal EBTKE Kementerian ESDM2011Detail
    Review Gas Turbine Type LM - 6000, Review Kewajaran Harga Pembangunan PLTG Senipah (2 x 41 MW).PT. KERTANEGARA ENERGI PERKASA2011Detail
    Feasibility Study PLTU Riau (2 x 100 MW) Lokasi Pekan Baru (1061) PT. PLN (Persero) Jasa Enjiniring.PT. PLN (Persero) Jasa Enjiniring2010Detail
    Studi Kelayakan PLTU Sintang (3 x 7 MW) 1065.PT. PLN (Persero) Pusat Enjiniring Ketenagalistrikan2010Detail
    Studi Kelayakan PLTU Sanggau (2 x 7 MW) 1066.PT. PLN (Persero) Pusat Enjiniring Ketenagalistrikan2010Detail
    Pendistribusian Tabung LPG Uk. 3 Kg berikut Kompor dan Asesoriesnya untuk Masyarakat Rumah Tangga sebanyak 54.000 Paket di lokasi Kecamatan Kediri Marga, Baturiti, Penebel, Kabupaten Tabanan.Perusahaan Pertambangan Minyak dan Gas Bumi Negara PT. PERTAMINA (PERSERO) Gas Domestik Region IV2009Detail
    Pendistribusian Tabung LPG Uk. 3 Kg berikut Kompor dan Asesoriesnya untuk Masyarakat Rumah Tangga sebanyak 53.306 Paket di lokasi Kecamatan Babadan, Badegan, Balong, Bungkal, Jambon Kabupaten Ponorogo.Perusahaan Pertambangan Minyak dan Gas Bumi Negara PT. PERTAMINA (PERSERO) Gas Domestik Region IV2009Detail
    Pendistribusian Tabung LPG Uk. 3 Kg berikut Kompor dan Asesoriesnya untuk Masyarakat Rumah Tangga sebanyak 15.618 Paket di lokasi Kecamatan Babadan, Badegan, Balong, Bungkal, Jambon Kabupaten Ponorogo.Perusahaan Pertambangan Minyak dan Gas Bumi Negara PT. PERTAMINA (PERSERO) Gas Domestik Region IV2009Detail
    Site Investigation dan Detail Desain Untuk Demolition / Relocation Fasilitas Gas Fired Power Plant Extension Project 720 MW Tanjung Priok Jakarta.PT. Wasa Mitra Engineering2009Detail
    Analysis of Dinamic Characteristik Test & Analysis of boiler Dynamic Characteristic Tes for Tarahan Coal Fired Steam Power Plant Project Units 3 & 4 (2 x 100 MW).Tokyo Electric Power Services Co., LTd. 3-3, Higashi - Ueno 3 - Chome, Taito - Ku, Tokyo, Japan2009Detail
    Site Visit dan Presentasi Pembangkit Listrik Tenaga Minihidro Paweden (2 x 1,58 MW) Desa Paweden, Kecamatan Banjarnegara, Kabupaten Banjarnegara, Jawa Tengah.PT. Laguna Inti Energi2009Detail
    Front End Engineering Design (FEED) dan Detail Desain Engineering Design for Construction (DEDC) Pembangunan Jaringan Gas Bumi untuk Rumah Tangga di Kota Sidoardjo.Pejabat Pembuat Komitmen (P2K) Pembangunan Jaringan Distribusi Gas Bumi, Direktorat Jenderal Minyak dan Gas Bumi 2009Detail
    Pendistribusian Tabung LPG UK 3 Kg & Kompor Berikut Asesoris ke Masyarakat Pengguna Minyak Tanah di Ganti LPG di Kabupaten Bogor.PT PERTAMINA (Persero) 2008Detail
    Analisa Jaringan, Load Forecast dan Penyusunan Master Plan AJ Gambir AJ Kebayoran, AJ Kramat Jati dan AJ. Tangerang (5453).PLN JE Bidang Pembangkit2008Detail
    Pendistribusian Tabung LPG Uk. 3 Kg & Kompor Berikut Asesories ke Pengguna Minyak Tanah diganti LPG di Kabupaten Bandung.Perusahaan Pertambangan Minyak dan Gas Bumi Negara PT. PERTAMINA (PERSERO) Gas Domestik Region II 2008Detail
    Pendistribusian Tabung LPG Uk. 3 Kg & Kompor Berikut Asesories ke Pengguna Minyak Tanah diganti LPG di Kabupaten Cirebon.Perusahaan Pertambangan Minyak dan Gas Bumi Negara PT. PERTAMINA (PERSERO) Gas Domestik Region II 2008Detail
    Pendistribusian Tabung LPG Uk. 3 Kg berikut Kompor dan Asesoriesnya untuk Masyarakat Rumah Tangga sebanyak 80.000 Paket di lokasi Kecamatan Pabuaran, Bojong Genteng, Cibitung, Tegalbuled, Segaranten, Curugkembar, Cidadap, Cidolog dan Kalibunder, Kabupaten Sukabumi.Perusahaan Pertambangan Minyak dan Gas Bumi Negara PT. PERTAMINA (PERSERO) Gas Domestik Region II2008Detail
    Pendistribusian Tabung LPG Uk. 3 Kg berikut Kompor dan Asesoriesnya untuk Masyarakat Rumah Tangga sebanyak 70.000 Paket di lokasi Kecamatan Jatiwangi, Leuwimunding, Palasah, Panyingkiran, Sindangwangi dan Kadipaten, Kabupaten Majalengka.Perusahaan Pertambangan Minyak dan Gas Bumi Negara PT. PERTAMINA (PERSERO) Gas Domestik Region II2008Detail
    Pra Study Kelayakan (FS) Pembangunan PLTG/PLTGU di Pulau Damar.Suku Dinas Pertambangan Kabupaten Administrasi Kepulauan Seribu, Pemerintah Propinsi DKI Jakarta2007Detail